• SPI-B1 POM PA6 Rotation Shaft For Automatic Device
  • SPI-B1 POM PA6 Rotation Shaft For Automatic Device
  • SPI-B1 POM PA6 Rotation Shaft For Automatic Device
  • SPI-B1 POM PA6 Rotation Shaft For Automatic Device
SPI-B1 POM PA6 Rotation Shaft For Automatic Device

SPI-B1 POM PA6 Rotation Shaft For Automatic Device

Product Details:

Place of Origin: China
Brand Name: Forwa
Certification: ISO9001 / ISO14001 / IATF16949
Model Number: Custom

Payment & Shipping Terms:

Minimum Order Quantity: 1 set
Price: According to the mould requirement and mould cavity
Packaging Details: Custom wooden box
Delivery Time: 40 days after 2D and 3D mould design confirmed
Payment Terms: T/T
Supply Ability: About 40 Sets per month
Get Best Price Contact Now

Detail Information

Part Name: Main Shaft Cavity: 1*8
Material: POM/PA6 Color: White
Runner: Hot Runner (8pcs Open Hot Drops) Gate: Sub Gate
Cavity Steel: S7 Core Steel: S7
Insert Steel: S7 Generial Polishing: SPI-B1
Tolerance: +/-0.02
High Light:

PA6 Rotation Shaft

,

SPI-B1 Rotation Shaft

,

DME Mould Main shaft

Product Description

SPI-B1 POM PA6 Rotation Shaft For Automatic Device

Rotation shaft part for automatic device , Main shaft , Main shaft is the key connector by the gear

 

Mould information

1.Mould standard DME
2.Mould type 2 plate
3.Mould base steel S55C
4.A/B plate steel Chinese P20
5.Core/Caviry steel S7
6.Runner type Hot runner (8pcs Open hot drop turn into cold runner)
7.Gate type Sub gate
8.Project name Automatic device
9.Part name Main shaft
10.Material available POM / PA6
11.Shrinkage rate 1.020
12.Part color White / Nature / Black
13.Surface finishing SPI-B1
14.Cycle time 45s
15.Injection machine 280T
16.Injection machine brand Arburg / Fanuc / Haitian
17.2D Mould structure CAD Software (DWG, DXF Format)
18.3D Mould structure UG, Proe Software (Prt, X-T, stp, step, Igs, Iges, Format etc.)
19.Mould folw report CAD Mould flow (PPT format)
20.Mould processing report Update each week
21.MOQ 1 set
22.Payment term T/T
23.Package Custom Wooden box
24.Deliverly date 40 days
25.Mould number According to customer requirement
26.Mould life 1.5 million shots

 

Part Function:

The part is for connecting other 2 related parts, and turn them to make the device work.

So It is the important part. The tolerance requirement is tight and up to +/-0.02mm.

 

FAQ                                                              

Q: How can you get the quotation?

When we get the detailed information during working days, we will provide you the quotation within 24 hours.

Please help to provide us the following information with your inquiry.

 

1) 2D Part drawing. (CAD or DXF format)
2) 3D Part drawing. (Prt, X-T, stp, step, Igs, Iges, Format etc.)

3) Mould cavity. (1*1 or 1*2 or 1*4 etc.)
3) Part Material. (Material requirement or Material date sheet)

4) Mould standard. (DME or HASCO or LKM) 

5) Mould standard component. (DME or HASCO or MISUMI or LKM)

6) Mould Steel.
7) Part surface treatment.
8) Quantity of plastic part. (per order / per month / annual)

9) Mould life.
10) Any special demands or requirements, such as packing, labels,delivery etc.

 

SPI-B1 POM PA6 Rotation Shaft For Automatic Device 0

Q: What are the main oversea markets of Forwa?
1)Currently Forwa regular oversea customers are from the USA, the UK, Italy, Germany, France and India etc.

 

Q: How do we control the quality?

1). When getting the new order, Our team will open a meeting to analyze the part stucture and mould stucture carefully to ensure everyting is great.
2). Our team will review the mould design and improve it to ensure mould life and mould operation before start to build the mould.

3). The project team will follow each step mould processing to ensure the mould processing on time and the mould processing quality.

4). Our QC team will inspect all the mould components after each processing step finish and then go next step. 

5). Our technical team will fit the mould carefully.

6). After the mould completed, our project team will check the mould operation before testing the mould.

7). Mould need to run about 3~4 hours during testing to ensure the mould operation.

8). The first sample inspected by QC and then provide the good samples to customer for testing.

9). During production, our IPQC will check the parts per 2 hours, ensure no any rejects;
10). FQC will check the products before sending to the warehouse;
11). 100% inspected by OQC before shipping out.

SPI-B1 POM PA6 Rotation Shaft For Automatic Device 1

Q: What should we do if customer receive defective products?
1): If receive defective product, please send us the photos, we will feedback to our engineers and QC departments and solve the problems ASAP.

Q: How to pack the moulds and products?
1).For moulds, we will be coated one-layer anti-rust oil first,and then also will be covered thin films on the mould, finally pack into fumigation wooden case.
2).And as to products, we will pack into standard export cartons or as per customer’s request to pack.

Want to Know more details about this product
I am interested in SPI-B1 POM PA6 Rotation Shaft For Automatic Device could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.